Women on the Loop, Captain Training, and a Hurricane Watch
It’s been six weeks since the last update. A lot has happened. Here’s where we are.
October 9th Cleanup — Postponed
We had plans for a community trash cleanup on October 9th near Dog River Marina. We’re postponing — there’s a possible hurricane heading this way and we’re watching it closely. More rain and flooding than Mobile has seen in years, and high tides have been flooding the entire marina parking lot. We’ll reschedule when the weather cooperates.
New Intern: Jayden via Standout Connect

We have a new high school intern. Jayden is from New York and came to us through Standout Connect — an organization that pairs teens from across the US (and internationally) with nonprofits for remote work experiences. I’d never heard of them before they reached out, and I’m genuinely impressed.
We gave Jaden a menu of projects to choose from. He chose to use CAD to design a waterproof storage system for the flybridge — specifically to house the large NOAA Marine Debris ambassador kits and other equipment that’s currently taking up interior living space. Really practical, really creative. I’ll introduce him more formally when he’s ready.
→ Learn more about Standout Connect
Boat Systems — Honest Update
Let me walk through where things stand.
The refrigerator: it eventually died completely. The culprit is the SECOP controller — a common failure point on these units. Vitrifrigo’s US representative walked me through a full diagnosis, we confirmed the issue, and I ordered the replacement controller from Defender Marine. It’s on the way.
The macerator pump: not working since we received the boat, but not for lack of trying. Amy Todd and Brandon Wang donated a new pump — they’re also the ones who helped me move Me Va from Gulf Shores to Dog River Marina and kept me company through weeks of troubleshooting. Brandon, who works for NOAA Fisheries and was waiting for a ship assignment, detailed this boat bow to stern while he was here. The fittings to complete the macerator installation are also on order from Defender.
The AC: I learned the hard way about seawater intake pumps. When the tide gets low and the boat sinks towards the silty bottom, the pump pulls up debris and gets progressively clogged. We lost the AC when it was 100 degrees outside. A room unit is keeping things livable in the meantime, and a descaler/cleaning kit is coming to clear the system.
Charging system: ancient fuses in the battery 1 circuit — located and identified. Replacements on order.
Everything so far has been minor. It seemed more major at first because I didn’t know these systems. Once I figured them out, I felt a lot better about all of it.
Teak work is underway — slowly. There’s over 300 feet of teak railing that needs old varnish stripped and refinished. It’s a labor of love. It’s also not the highest priority right now, so we’re chipping away at it between everything else.
Teal’c — Stay-and-Train
Teal’c is sweet, smart, and easy to work with one-on-one — but he missed early socialization and he’s reactive. New people, new situations, the unpredictability of marina life — it’s a lot for him. We’ve come a long way already, and Friday he met a local trainer who gave me a lot of tools and confidence.
Next week he goes in for a stay-and-train program to work through the reactivity specifically. I’m cautiously optimistic. There are going to be a lot of people involved in this expedition and it needs to be a good situation for him. If it’s not — I’ll do what’s right for him. But I’m giving this every possible chance first.
NOAA MDP — Jessi and the Kits
A few weeks ago I had lunch with Jessi James-Barry, Gulf Coast Regional Coordinator for the NOAA Marine Debris Program, at Moe’s BBQ in Mobile. Excellent food. Gluten-free options. I did not get a selfie, which I will regret forever.
Jessi brought 10 of the 20 ambassador kits to lunch, and I left with 5 of them. Today I’m heading to the NOAA facility here in Mobile to pick up the rest and get a tour. These kits include a measuring wheel for beach debris surveys, among other things — I’ll do a full walkthrough video once I have them all aboard.
SeaKeepers Society — Better Than Expected
The SeaKeepers Society conversation was fantastic. Originally I connected with them before we got Me Va, as a backup option for vessel access. What I didn’t know is how deep their mission goes.
SeaKeepers connects boat owners who want to participate in real science with researchers who need vessel access. But they also have an active education outreach arm and a junior scientist ambassador cohort they run annually out of the Miami-Dade area. Real youth science programming, real field work.
Here’s the exciting part: they want us involved in two directions. As researchers who may need vessel access when Me Va is in for service. And as a research platform — offering college students and young scientists field research opportunities aboard Me Va. Both directions fit perfectly with our mission.
Lexa Is Coming Aboard — Women on the Loop!
This one I’m really excited to share. Lexa — our full-time intern who’s been working with us remotely — is coming down to join the expedition. For now at least, it’s going to be a Women on the Loop crew. That feels right.
The Boat Neighbor — Retired Navy Ship Captain
We have an extraordinary neighbor at Dog River Marina. He’s a retired Navy ship captain and he and his wife are planning to start the Great Loop themselves in the next year or two.
At the end of October, they’re taking us out for a week of intensive training. Docking, anchoring, fueling, maintenance procedures — everything we need before we cast off. The fact that this lined up so amazingly is the kind of thing that keeps making me feel like this expedition is exactly where it’s supposed to be.
Phase 1 Support — How You Can Help
We’re calling this Phase 1 — the refit and preparation phase. Total cost to get Me Va ready for the loop is going to be around $10,000. If you’ve been following along and you want to be part of making this happen:
Skills and labor: if you’re in the Mobile Bay area and have diesel engine experience, marine systems knowledge, or other relevant skills — reach out. We need hands.
In-kind parts: Amy and Brandon showed us exactly what in-kind donations look like in practice. If you work in the marine industry, check our needs list at cultivatingcurrents.org/inkind-support.
Donations: we’re a 501(c)(3) nonprofit. Every dollar is tax-deductible and goes directly toward this expedition.
→ Donate at cultivatingcurrents.org/donate
→ In-kind support: cultivatingcurrents.org/inkind-support
The Plan: Thanksgiving Then Launch
Here’s where we’re headed. At the end of October, captain training with our neighbor. Lexa arrives. We train together.
Then we close up the boat — sea cocks, pumps, all of it — and fly home to Laramie. I’ll spend Thanksgiving with my kids. Then we come back, reopen her, pack up, and head out into the loop the first week of December.
First week of December. We go.
Subscribe to the YouTube channel and sign up for the newsletter at cultivatingcurrents.org. Weekly updates are back. You won’t want to miss what’s coming.


